Glacier Data Center (Client Confidential)

Location: Northern Illinois    Sq. Ft: 42 Acre Worksite   Floors: 3

New Construction of Massive Data Center

Scope-of-Work:

189,000 sq. ft. ground up Tier III Data Center

Accelerated schedule requiring phased design packages

New dual feed dedicated electric service scalable from 10-30 MW

(8)-(16) 2,000kw (scalable) engine plant

45,000 sq. ft. Day 1 raised floor at 50 watts/sf, scalable to 90,000 sq. ft. @150 watts/sf

12.47 kv /575 v distribution

Multiple water services, well, and 1.2 million gallon TES tank

Three chiller plants Day 1 with scalability to add a fourth chiller plant

Extensive security/bomb blast/seismic requirements

Master planning of site and mechanical/electrical systems to accommodate 175,000 sq. ft. Phase II expansion

Designed to withstand F2 tornado

 