Location: New York     Sq. Ft: 200,000   

HQ Re-Stack & Infrastructure Upgrade, including High-Floor
Installation of 2000KW Diesel Generator

Scope-of-Work:

HQ Restack & Infrastructure Upgrade

2000 KW Diesel Generator rigged to 17thfloor setback

10,000 Gallon Fuel Tank

Fuel oil supply system from sub-cellar to the 17th floor

Installation of 15 automatic transfer switches

Installation of emergency power system from sub cellar to 45th floor

Conduit and THHN Cable for EPS

Dunnagefor generator and chiller plant

Complete site integration test with new generator and existing infrastructure

250 seat trading floor

Renovated elevator lobbies with wood paneled walls and stone floors

100,000 square foot office fit-out

New chiller system

New floor mounted fan coils floor & under floor air distribution system

Siemens BMS system

Conference Center with extensive

 