Financial
Calyon
Location: New York Sq. Ft: 200,000
HQ Re-Stack & Infrastructure Upgrade, including High-Floor
Installation of 2000KW Diesel Generator
Scope-of-Work:
HQ Restack & Infrastructure Upgrade
2000 KW Diesel Generator rigged to 17thfloor setback
10,000 Gallon Fuel Tank
Fuel oil supply system from sub-cellar to the 17th floor
Installation of 15 automatic transfer switches
Installation of emergency power system from sub cellar to 45th floor
Conduit and THHN Cable for EPS
Dunnagefor generator and chiller plant
Complete site integration test with new generator and existing infrastructure
250 seat trading floor
Renovated elevator lobbies with wood paneled walls and stone floors
100,000 square foot office fit-out
New chiller system
New floor mounted fan coils floor & under floor air distribution system
Siemens BMS system
Conference Center with extensive